2024 DumpsTorrent SAP C-S43-2022 Dumps and Exam Test Engine [Q38-Q63]

Share

2024 DumpsTorrent SAP C-S43-2022 Dumps and Exam Test Engine

SAP C-S43-2022 DUMPS WITH REAL EXAM QUESTIONS


SAP C-S43-2022 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Organizational Units and Master Data
  • Describe and implement the process of breakdown maintenance using traditional
Topic 2
  • Describe and implement the process of corrective maintenance using traditional
  • Describe and implement technical asset structures following fundamental concepts
Topic 3
  • Describe UI technologies and client types used with SAP S
  • 4HANA Asset Management
  • Maintenance Processing - Advanced Functions
Topic 4
  • Describe the options for preventive maintenance using task lists
  • User Interface and Mobile Maintenance
Topic 5
  • Describe and implement the necessary organizational units
  • Time-based strategy and performance-based strategy maintenance plans

 

NEW QUESTION # 38
You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question

  • A. Measuring point category
  • B. Usage period
  • C. Status profile
  • D. Object information
  • E. Warranty category

Answer: B,C,D


NEW QUESTION # 39
What are mandatory characteristics of orders with Operation Account Assignment (OAA)? Note: There are 3 correct answers to this question

  • A. Purchase requisitions have the operation as account assignment.
  • B. The settlement rule is maintained on the header level.
  • C. A technical object must be assigned to an order operation
  • D. Overall costs are dynamically summed up on the header level.
  • E. Costs are stored only for the operation object

Answer: C,D,E


NEW QUESTION # 40
You want to display additional document information within the document flow of a maintenance order.
For which type of document must this be customized?

  • A. Purchase order
  • B. Service entry sheet
  • C. Invoice
  • D. Goods movement

Answer: D


NEW QUESTION # 41
You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?

  • A. Maintenance package offset
  • B. Package hierarchy
  • C. Scheduling indicator
  • D. Cycle modification factor

Answer: A

Explanation:
Explanation
To set up a scenario for regular maintenance, the first event should take place after 1 year, and after that, it is a regular cycle of 6 months, you have to use the maintenance package offset parameter to map this in the system. The maintenance package offset is used to define the time interval between the start of the maintenance plan and the first call date of the maintenance package1. A maintenance package is a set of data that defines the frequency and scope of the maintenance tasks2.
For example, if you want to create a maintenance plan with two maintenance packages, one for annual inspection and one for semi-annual inspection, you can use the following settings:
Maintenance package 1: Cycle length = 12 months, Offset = 0 months, Scheduling indicator = Time-based Maintenance package 2: Cycle length = 6 months, Offset = 12 months, Scheduling indicator = Time-based This means that the first maintenance package will be called at the start of the maintenance plan, and then every 12 months thereafter. The second maintenance package will be called after 12 months from the start of the maintenance plan, and then every 6 months thereafter.
The other parameters that are not relevant for this scenario are:
Package hierarchy: This is used to define the relationship between different maintenance packages within a maintenance plan. It allows you to create nested or parallel maintenance packages that are dependent on each other3.
Scheduling indicator: This is used to define the type of scheduling for the maintenance package, such as time-based, performance-based, or condition-based4.
Cycle modification factor: This is used to modify the cycle length of the maintenance package by a certain percentage or factor5.
References: 1: SAP Help Portal - Maintenance Package Offset 2: SAP Help Portal - Maintenance Package 3: SAP Help Portal - Package Hierarchy 4: SAP Help Portal - Scheduling Indicator 5: SAPHelp Portal - Cycle Modification Factor


NEW QUESTION # 42
What do you have to consider when implementing Ul technologies in SAP S/4HANA Asset Management?
Note: There are 2 correct answers to this question

  • A. The cloud version can also use SAP GUI for Windows.
  • B. SAP Fiori Launchpad supports only SAPUIS apps.
  • C. Web Dynpro apps can be used in the SAP Fiori Launchpad.
  • D. SAP GUI for HTML can be used in the SAP Fiori Launchpad.

Answer: C,D

Explanation:
Explanation
When implementing UI technologies in SAP S/4HANA Asset Management, you have to consider the following points:
Web Dynpro apps can be used in the SAP Fiori Launchpad. This is true because Web Dynpro is one of the UI technologies that are supported by the SAP Fiori Launchpad, along with SAP Fiori apps, SAP GUI for HTML, and WebClient UI12.
SAP Fiori Launchpad supports only SAPUI5 apps. This is false because SAP Fiori Launchpad supports not only SAPUI5 apps, but also other UI technologies such as WebDynpro, SAP GUI for HTML, and WebClient UI12.
SAP GUI for HTML can be used in the SAP Fiori Launchpad. This is true because SAP GUI for HTML is one of the UI technologies that are supported by the SAP Fiori Launchpad, along with SAP Fiori apps, Web Dynpro, and WebClient UI12.
The cloud version can also use SAP GUI for Windows. This is false because SAP GUI for Windows is only available for the on-premise version of SAP S/4HANA Asset Management, not for the cloud version31.
References: 3: Explaining the Intelligent Enterprise - SAP Learning 1: UI Technology Guide for SAP S/4HANA 1909 - SAP Online Help 2: SAP S/4HANA UI Technology | SAP Help Portal


NEW QUESTION # 43
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question

  • A. Assign a subordinate piece of equipment.
  • B. Change a reference location.
  • C. Edit classification data and characteristics.
  • D. Assign documents
  • E. Create a task list for functional location

Answer: B,C,D


NEW QUESTION # 44
The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?

  • A. A purchase requisition can be created automatically as soon as the order is saved.
  • B. A goods receipt can be posted after the maintenance order is technically completed.
  • C. A purchase order is created automatically as soon as the order is saved.
  • D. A purchase requisition will ALWAYS be created as soon as the order is saved.
  • E. The maintenance order can be set to TECO before the invoice is created

Answer: A,B,E

Explanation:
Explanation
Non-stock materials are materials that are not kept in stock, but are procured externally as required1. They can be maintained in the material master as service products (product type SERV). You can add non-stock materials to an operation or suboperation as a component. The system creates a purchase requisition and a purchase order in the same way as for non-stock materials that you procure externally1.
Among the given options, the following are possible for non-stock materials in a released maintenance order:
A purchase requisition can be created automatically as soon as the order is saved. This is the default behavior for non-stock materials, unless you change the configuration settings2.
The maintenance order can be set to TECO (technically completed) before the invoice is created. This is possible if you use the compatibility mode for external procurement, which allows you to technically complete the order even if there are open purchase requisitions or purchase orders2.
A goods receipt can be posted after the maintenance order is technically completed. This is possible if you use the enhanced mode for external procurement, which allows you to post goods receipts for non-stock materials after the order is technically completed2.
The following options are not possible for non-stock materials in a released maintenance order:
A purchase order is created automatically as soon as the order is saved. This is not possible, as the purchase order requires manual processing and approval after the purchase requisition is created2.
A purchase requisition will ALWAYS be created as soon as the order is saved. This is not always true, as you can change the configuration settings to create the purchase requisition manually or at a later point in time2.
Therefore, the correct answers are A, B, and C. References: 1: What's New in SAP S/4HANA 2021 - SAP Online Help 2: How to Configure SAP S/4HANA Asset Maintenance Subcontracting - SAP PRESS


NEW QUESTION # 45
Which of the following is a prerequisite for external refurbishment?

  • A. Assign an external work center to a maintenance order operation
  • B. Activate the subcontracting indicator in an external activity.
  • C. Define the order type for external refurbishment.
  • D. Select the material group for externally refurbished materials.

Answer: B


NEW QUESTION # 46
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question

  • A. The configuration of the order type decides whether you use Resource Scheduling or not.
  • B. The order moves to the Preparation phase once it is approved and released
  • C. If you use the Resource Scheduling apps, you always dispatch orders and operations.
  • D. Maintenance Planning Buckets give you a list of non-approved notifications

Answer: B,C


NEW QUESTION # 47
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?

  • A. Via the SAP Fiori app "Maintenance Scheduling Board"
  • B. Within the SAP Fion-based background job
  • C. Via the SAP Fiori epp "Manage Maintenance Planning Buckets"
  • D. Via the SAP Fiori app "Manage Maintenance Order List"

Answer: A,D


NEW QUESTION # 48
To which objects can a personnel number be directly assigned? Note: There are 2 correct answers to this question?

  • A. Maintenance plan
  • B. Planner group
  • C. Business partner
  • D. Work center

Answer: C,D


NEW QUESTION # 49
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct answers to this question

  • A. Verify planned and actual costs
  • B. Plan repair work for the responsible work center
  • C. Complete the malfunction report
  • D. Find malfunction records already created in a list
  • E. Assign a production resource tool (PRT) to the operation

Answer: B,C,D


NEW QUESTION # 50
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?

  • A. Referenced notifications are put in Process again.
  • B. Open purchase requisitions are recompiled
  • C. Open purchase orders are recompiled.
  • D. Open reservations are recompiled.

Answer: A,D

Explanation:
Explanation
This means that the system updates the reservation quantity and status according to the actual consumption of materials in the work order. The reservation quantity is set to the difference between the planned quantity and the actual quantity. The reservation status is set to open if the reservation quantity is greater than zero, or to closed if the reservation quantity is zero or negative1.
Referenced notifications are put in Process again: This means that the system changes the status of the notifications that are linked to the work order from Completed to In Process. The notifications can then be edited or processed further1.
The other options are not correct because:
Open purchase requisitions are recompiled: This is not an effect of canceling the technical completion of a work order. The system does not change the purchase requisitions that are created for external services or non-stock materials in the work order. The purchase requisitions remain open until they are converted into purchase orders or deleted1.
Open purchase orders are recompiled: This is not an effect of canceling the technical completion of a work order. The system does not change the purchase orders that are created for external services or non-stock materials in the work order. The purchase orders remain open until they are confirmed, invoiced, or deleted1.
References:
1: Canceling a Technical Completion | SAP Help Portal


NEW QUESTION # 51
Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question

  • A. Assign an Inspection Type to a Maintenance Order Type.
  • B. Maintain settings at plant level for usage decisions.
  • C. Create a control key which expects inspection characteristic assignments
  • D. Assign an Inspection Type to a Maintenance Order Type and a Planning Plant

Answer: A,B


NEW QUESTION # 52
Which SAP UI technology is used for the Report and Repair Malfunction app?

  • A. SAP GUI for HTML
  • B. Web Dynpro
  • C. Business Server Pages
  • D. SAPUI5

Answer: D

Explanation:
Explanation
The Report and Repair Malfunction app is a Fiori app that uses SAPUI5 as the UI technology. SAPUI5 is a modern, HTML5-based, JavaScript UI library that enables developers to create rich and responsive web applications. Web Dynpro, SAP GUI for HTML, and Business Server Pages are older UI technologies that are not used for Fiori apps. References:
Report and Repair Malfunction | SAP Help Portal
First Fiori App for Maintenance Technician: "Report and Repair Malfunction" for SAP S/4HANA Cloud 1708 and 1709 | SAP Blogs


NEW QUESTION # 53
Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question.

  • A. Schedule and dispatch maintenance operations by shifts.
  • B. Print job papers from a maintenance order.
  • C. Monitor maintenance order operations due in the next 4 weeks
  • D. Dispatch maintenance order operations

Answer: C,D

Explanation:
Explanation
The Resource Scheduling for Maintenance Planners app allows you to monitor important KPIs for your work centers, such as utilization, priority of due maintenance orders, and unconfirmed maintenance orders. You can also use filters to show the information that you are interested in. By clicking a card, you can access the Manage Work Center Utilization app, where you can dispatch maintenance order operations to your work centers. You cannot schedule and dispatch maintenanceoperations by shifts or print job papers from a maintenance order in this app. These functions are available in other apps, such as the Maintenance Scheduling Board app and the Print Job Papers app. References: Resource Scheduling for Maintenance Planners | SAP Help Portal and Resource Scheduling for Maintenance Planners | SAP Blogs


NEW QUESTION # 54
Which of the following are standard functionalities of SAP Service and Asset Manager (formerly SAP Asset Manager)? Note: There are 3 correct answers to this question?

  • A. ESRI Maps
  • B. Cost analytics
  • C. Technical objects
  • D. Work orders and operations
  • E. Breakdown analytics

Answer: A,C,D

Explanation:
Explanation
SAP Service and Asset Manager is a predictive asset management application that supports both maintenance and service technicians. Using this app, you can manage work orders, notifications, condition monitoring, material consumption, time management, and failure analysis1.
Some of the standard functionalities of SAP Service and Asset Manager are:
Technical objects: You can view and edit technical objects such as functional locations, equipment, and measuring points. You can also create new technical objects or link existing ones to work orders or notifications2.
Work orders and operations: You can view and edit work orders and operations assigned to you or your team. You can also create new work orders or operations, or confirm them as completed2.
ESRI Maps: You can view the location of your work orders, notifications, and technical objects on an interactive map powered by ESRI. You can also use the map to navigate to your destination or search for nearby assets2.
The other options are not standard functionalities of SAP Service and Asset Manager. Cost analytics and breakdown analytics are features of SAP Intelligent Asset Management, which is a cloud-based solution that integrates with SAP Service and Asset Manager to provide advanced insights and recommendations for asset performance3. References: 1: SAP Service and Asset Manager Overview 2: SAP Service and Asset Manager User Guide 3: SAP Intelligent Asset Management Overview


NEW QUESTION # 55
How does a performance-based maintenance plan calculate the interval between start date and planned date?

  • A. Cycle length divided by (annual performance/365)
  • B. Cycle length divided by (monthly performance x 12)
  • C. Cycle length divided by ((scheduling period) x (cycle modification factor))
  • D. Cycle length divided by annual performance

Answer: D

Explanation:
Explanation
A performance-based maintenance plan calculates the interval between start date and planned date by dividing the cycle length by the annual performance. The cycle length is the time or counter reading that is required for one maintenance cycle. The annual performance is the estimated time or counter reading that the object will achieve in one year. For example, if the cycle length is 100 hours and the annual performance is 2000 hours, then the interval is 100/2000 = 0.05 years or 18.25 days. References:
Asset Management in SAP S/4HANA Cloud 2208 | SAP Blogs, section "Final Due Date in Maintenance Orders Based on the Compliance Calculation Method (+ demo)" Highlights for Asset Management in SAP S/4HANA 2021 | SAP Blogs, section "Final Due Date, offered via business function LOG_EAM_IME_1" SAP Help Portal: Maintenance Plan


NEW QUESTION # 56
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question

  • A. Start counter reading
  • B. Estimated annual performance
  • C. Scheduling period
  • D. Counter overflow reading

Answer: A,B

Explanation:
Explanation
To schedule a performance-based maintenance plan, you need to specify the start counter reading and the estimated annual performance of the equipment or functional location. The start counter reading is the initial value of the counter assigned to the maintenance plan. The estimated annual performance is the expected value of the counter for one year. These parameters are used to calculate the maintenance cycle and the due date for the maintenance plan. The scheduling period and the counter overflow reading are optional


NEW QUESTION # 57
Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question

  • A. Confirm time sheets
    * Attach documents
  • B. Change BOM
    * Create a work order on the ESRI map
  • C. Display maps
    * Display and maintain technical objects
  • D. Schedule resources
    * Change task list

Answer: A,C


NEW QUESTION # 58
What are valid item categories for a BOM used in Asset Management? Note: There are 3 correct answers to this question.

  • A. E (Equipment)
  • B. I (PM Structure element)
  • C. D (Document item)
  • D. F (Functional location)
  • E. L (Stock item)

Answer: A,C,E

Explanation:
Explanation
A BOM (bill of material) is a structured list of components that make up a technical object, such as an equipment or a functional location. A BOM item is a component of a BOM and it has an item category that classifies the type of component. The valid item categories for a BOM used in Asset Management are:
D (Document item): This item category is used to assign documents or document info records to a BOM. Documents can contain technical drawings, specifications, or instructions for the maintenance of the technical object1.
L (Stock item): This item category is used to assign stock materials to a BOM. Stock materials are materials that are managed in inventory and have a material master record. Stock materials can be spare parts, consumables, or tools that are required for the maintenance of the technical object1.
E (Equipment): This item category is used to assign equipment to a BOM. Equipment are individual, physical objects that are maintained as an autonomous unit and have an equipment master record. Equipment can be sub-components of a technical object, such as pumps, motors, or valves1.
The other item categories are not valid for a BOM used in Asset Management:
I (PM Structure element): This item category is used to create a hierarchical structure for a BOM. PM structure elements are not physical components, but logical nodes that group or classify the BOM items. PM structure elements are only used in plant maintenance and customer service, not in Asset Management1.
F (Functional location): This item category is used to assign functional locations to a BOM. Functional locations are organizational units that represent the spatial or process-oriented structure of a technical system. Functional locations are not components of atechnical object, but locations where the technical object is installed or operated. Functional locations are only used in plant maintenance and customer service, not in Asset Management1.
References: 1: BOM item | SAP Help Portal


NEW QUESTION # 59
What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.

  • A. The planner can change estimated costs only at the header level
  • B. The assignment of the notification to the maintenance order header cannot be deleted.
  • C. Goods receipts for external services can be entered.
  • D. The controller can determine actual cost surcharges.
  • E. The planner can change planned costs at the operation level

Answer: B,C,D

Explanation:
A maintenance order with status REL means that the order is released and ready for execution. At this stage, the following characteristics apply:
A: Goods receipts for external services can be entered. This is true because external services are procured through purchase orders that are linked to the maintenance order. The service performer can post service entry sheets to record the executed work and consumable materials. These service entry sheets can be approved and posted as goods receipts for external services1.
B: The planner can change planned costs at the operation level. This is false because once the order is released, the planned costs are frozen and cannot be changed by the planner. The planner can only change the estimated costs at the header level2.
C: The planner can change estimated costs only at the header level. This is true, but it is not a characteristic of a released order. The planner can change the estimated costs at any time, even before the order is released2.
D: The controller can determine actual cost surcharges. This is true because the controller can use the business function LOG_EAM_CI_7 to calculate and post actual cost surcharges for maintenance orders. This function can be used for orders with status REL or TECO3.
E: The assignment of the notification to the maintenance order header cannot be deleted. This is true because the notification is the source document for the maintenance order and provides the reason for the order. The notification can only be deleted if the order is deleted or set to status CRTD. References: 1: Lean and Limit Value Services in Maintenance Order 2: Maintenance Order Cost Analysis 3: Actual Cost Surcharges for Maintenance Orders : Notification Assignment to Maintenance Order


NEW QUESTION # 60
What do you have to consider when setting up phase-based maintenance?

  • A. It can be used with any existing order type.
  • B. It is not possible to configure the nine delivered phases.
  • C. It comes preconfigured when using the relevant Best Practices scope items.
  • D. It is mandatory for breakdown and preventive maintenance.

Answer: C


NEW QUESTION # 61
You want to display vehicle-specific data for a piece of equipment. How do you proceed?

  • A. Set the relevant flags in Customizing activity "Define Additional Business Views for Equipment Categories".
  • B. Assign a view profile to the combination of vehicle type and equipment category.
  • C. Assign a view profile to an equipment category for fleet equipment.
  • D. Assign a view profile to the combination of equipment category and vehicle class.

Answer: C

Explanation:
Explanation
To display vehicle-specific data for a piece of equipment, such as the vehicle type, the vehicle class, the registration number, the license plate, and the vehicle identification number, you need to assign a view profile to an equipment category for fleet equipment. A view profile defines which fields are displayed and editable for a specific equipment category. You can create and assign view profiles in Customizing for Plant Maintenance and Customer Service under Master Data in Plant Maintenance and Customer Service -> Technical Objects -> Equipment -> Define View Profiles for Equipment Categories. You can also assign a view profile to an equipment category for fleet equipment in Customizing for Plant Maintenance and Customer Service under Master Data in Plant Maintenance and Customer Service -> Technical Objects -> Fleet Management -> Assign View Profiles toEquipment Categories for Fleet Equipment1. References: 1:
SAP Help Portal, SAP S/4HANA Asset Management, Learning Journey: SAP S/4HANA Asset Management, Topic: Fleet Management, Subtopic: Vehicle-Specific Data for Equipment.


NEW QUESTION # 62
How can you assign a material BOM to a piece of equipment?

  • A. Via field construction type
  • B. Via creation of an equipment BOM
  • C. Via material BOM header in the serialization data
  • D. Via field model number in the equipment master

Answer: A

Explanation:
Explanation
A material BOM is a list of components that make up a material. It can be used to describe the structure and composition of a product or a spare part. A material BOM can be assigned to one or more technical objects, such as equipment or functional locations, to define the materials required for maintenance activities1.
One way to assign a material BOM to a piece of equipment is via the field construction type in the equipment master. The construction type is a material number that identifies the material BOM for the equipment. By entering the construction type in the equipment master, the system automatically assigns the material BOM to the equipment2.
The other options are incorrect because:
Via field model number in the equipment master: The model number is a material number that identifies the material of the equipment itself, not the material BOM. It is used to create an equipment BOM, which is a list of components that are installed on the equipment. An equipment BOM can be different from a material BOM, as it can reflect the actual configuration of the equipment2.
Via material BOM header in the serialization data: The serialization data is a view in the material master that contains information about the serial numbers of the material. It is not related to the material BOM or the equipment assignment3.
Via creation of an equipment BOM: The creation of an equipment BOM is a different process from the assignment of a material BOM. An equipment BOM can be created from a material BOM, but it does not automatically assign the material BOM to the equipment. An equipment BOM can also be created manually or copied from another equipment2.
References: 1: Using Bills of Materials (BOMs) - SAP Learning 2: SAP PM Bills of Material Tutorial - Free SAP PM Training - ERProof 3: Serialization Data (SAP Library - Material Master (LO-MD-MM))


NEW QUESTION # 63
......